Punchlists

Using the Punchlist Module in the Pool Builder Geek Web Portal

The Punchlist module tracks the items left to finish or fix before a job is closed out, such as completion items, deficiencies and final project deliverables. You can see every punchlist item across your projects in one list, open any item to update it, and add new ones.

Open the Punchlist module

  1. In the left menu, under Construction, click Punchlists.
  2. The Punchlists page lists all of your punchlist items.
ColumnWhat it shows
NameThe item’s name. Click it to open the item.
ProjectThe project the item belongs to
AddressThe project’s service address
StatusFor example, Not Started or Complete
AssigneeThe team member or contractor assigned to the item
Created On / Created ByWhen the item was added, and who added it
Scheduled / CompletedThe scheduled date and the completed date
ActionsThe ⋮ menu, with more options

To find an item: Search by name, or filter by Status, Assignee, Start Date or End Date.

To download the list: Click Export in the top right.

View or edit a punchlist item

  1. Click the item’s Name to open the Edit Punchlist Item window.
  2. The left side of the window shows the item’s details:
    1. Item Name (required)
    1. Status (required)
    1. Assigned To
    1. Phase Schedule: Scheduled Date, Duration (Days), Start Date, Completed Date, Target Date, and an All day toggle
  3. The icons in the top right of the window switch the right-hand panel between these views:
    1. Activity Feed: Read and add posts about the item. Click + Add to post.
    1. Photos: View or Upload photos.
    1. Videos: View or upload videos.
    1. Files: View or Upload documents.
    1. Checklists: See the checklists linked to the item. Click + Add to attach one.
    1. Inspections: See any inspections required for this phase. These come from the agencies on the project’s Permits card, under Settings → Agencies & Permits.
  4. Click Update Item to save your changes, or Cancel to close without saving.

Add a new punchlist item

  1. On the Punchlists page, click + Add Punchlist Item in the top right.
  2. Fill in the details:
    1. Item Name (required)
    1. Status (required; defaults to Not Started)
    1. Assigned To: Search for a team member or contractor.
    1. Project (required): Choose the project this item belongs to.
    1. Phase Schedule: Add a scheduled date, duration and any other dates you need.
  3. Optionally, add a post, photos, videos, files or checklists from the right-hand panel.
  4. Click Create Item.

The new item now appears in the Punchlists list.

Tip: You must choose a project before you can create an item. If you click Create Item without one, you’ll see “Validation Error: Please select a project.”